Lanarkshire Welding Heavy Fabrication Bridge Refurbishment - Don Viaduct Encapsulation
Lanarkshire Welding Co Scotland Heavy Bridge Fabrication Insallation Logo 1000px

Our Latest Projects

Sparling Footbridge – Newton Stewart

38m Long, 4m High Vierendeel Truss

January 2020

Lichfield Bypass

December 2019

Auch Viaduct

Strengthening Project

October 2019 – February 2020

Scarborough Bridge

Footbridge Replacement

February 2019

65m long footbridge, 3.8m wide weathering steel structure consisting of 2 x 9.5m approach spans and 2 x 23m main spans. 

Don Viaduct

Re-Strengthening

February 2019 – September 2019

White Bridge, Inverness-shire

2 x 42.6m Weathering Steel Braced Pairs

January 2019 Installation

Arkleston, Paisley

42m Footbridge and Staircase

January 2019 Removal
February 2019 Installation

Polmadie, Glasgow

100m Footbridge

May 2018 Installation

River Witham – Lincoln

Eight U-Deck Bridges

August 2017 Installation

Nottingham Canal 

Single U-Deck Bridge
and Walkway Structures

Christmas 2018 Installation
Lanarkshire Welding Heavy Fabrication Nottingham Canal – Single U-Deck Bridge and Walkway Structures
Lanarkshire Welding Heavy Fabrication Nottingham Canal – Single U-Deck Bridge and Walkway Structures Drawing

Bonhill Road, Dumbarton

Triple U-Deck Installation with Cast in Plinths

October 2018 Installation

Farburn and Woodside

Twin U-Deck Installations at Farburn and Woodside in Aberdeenshire

July 2018 Installations
Lanarkshire Welding Heavy Fabrication Farburn and Woodside 1
Lanarkshire Welding Heavy Fabrication Farburn and Woodside 2
Lanarkshire Welding Heavy Fabrication Farburn and Woodside 3

Livingston South

300m Platform Renewal

Easter Weekend Installation 2018

Fairfield Street, London

4 x 80t U-Deck Bridges

March 2018 Installation

Muirhead Road, Baillieston

36m x 10m Road Bridge

Feb 2018 – Trial Erection at LWC Workshops

March 2018 Installation

West Calder

Installation of Lift Shafts, Staircases and Footbridge

December 2017 Installation

Lincoln

Re-Erection of Refurbished Grade II Listed Box Girders and Cross Girders

December 2017 Installation

Burnley Barracks

Single U-Deck Bridge

November 2017 Installation

Forres, Mosset Burn

Highland Enhancement Project

U-Deck Bridges

October 2017 Installation

River Witham, Lincoln

Grade II Listed Bridge to be Refurbished by LWC

River Witham Box Girders to be refurbished and placed around new bridge. Some parts are 170 years old.

Parkhouse, Manchester

Footbridge with Chevaux de Frise

August 2017 Installation

Falkirk, Glasgow Road

U-Deck Bridges

Easter Weekend Installation 2017

Albrighton

Trial Erection of U-Deck Bridges with Platforms and Collision Protection Beams

April 2017 Installation

River Witham

25m U-Deck Bridge

July 2017 Installation

Neilston Station, Glasgow

Removal of Neilston Station Footbridge

April 2017
Call Us

01698 264271

Our Office & Factory
John Street
Wishaw
North Lanarkshire
ML2 7TQ
SCOTLAND

Send Us A Message

13 + 12 =